Industrial Strength, Designer Finish
Transform concrete floors into durable, chemical-resistant, showroom-quality surfaces that last 15 to 20 years.
Our Approach
Florida garages and commercial spaces face unique challenges - moisture migration from concrete slabs, hot tire pickup, chemical spills, and high humidity. Our epoxy coating systems are specifically engineered for these conditions, with moisture barriers, proper diamond grinding preparation, and commercial-grade polyaspartic topcoats that resist yellowing from UV exposure.
From single-car garages to 10,000 sq ft commercial floors, we deliver a seamless, easy-to-clean surface that transforms any concrete space. Choose from solid colors, decorative flake blends, or stunning metallic finishes.
What We Offer
Garage
Complete garage floor transformation including concrete repair, diamond grinding, moisture barrier, base coat, decorative flake or metallic finish, and UV-stable polyaspartic topcoat.
Metallic
Designer metallic pigments create unique, one-of-a-kind swirl patterns and depth effects. Popular for showrooms, man caves, and high-end garages.
Commercial
Heavy-duty epoxy systems for warehouses, retail spaces, auto shops, restaurants, and medical facilities. Chemical resistant, slip-resistant, and easy to maintain.
Common Questions
Epoxy flooring in Melbourne FL costs $4 to $12 per square foot depending on the system. A standard 2-car garage (400-500 sq ft) with flake epoxy runs $2,000 to $4,000. Metallic epoxy costs $6 to $12 per square foot. Commercial epoxy ranges from $3 to $8 per square foot for larger areas.
Professional epoxy flooring in Florida lasts 15 to 20 years with proper preparation and a polyaspartic topcoat. UV-stable formulations prevent yellowing from sunlight exposure in open garages. The key to longevity is proper concrete preparation - diamond grinding creates the mechanical bond that keeps epoxy adhered for decades.
Light foot traffic is safe after 24 hours. Vehicle traffic is typically safe after 48 to 72 hours depending on the coating system. Full chemical resistance develops after 7 days of cure time. ELSO Contracting provides specific timing for each project based on the products used.
No, existing paint or coatings must be removed before epoxy application. Paint prevents proper adhesion and leads to peeling. Our process includes diamond grinding to remove old coatings, open the concrete pores, and create a proper bonding surface.